Building in Zeewolde with several partners

  • Client Municipality of Zeewolde
  • Country The Netherlands
  • Location Zeewolde
  • Status In Progress
1920x1080

A compact project that comprises the full range of civil engineering aspects The Havenkwartier residential area will become one of the new residential districts with a port and homes at dike level. Strukton Civiel, together with its partners, is responsible for raising the construction site, a new navigation channel with a navigation lock and a guard lock, and the road infrastructure.

Strong partnerships; increased quality due to increased knowledge

Optimal Total Cost of Ownership (TCO)
Strukton Civiel Noord & Oost is the principal contractor for this project and is responsible for the overall project management, the concrete works and road construction. Strukton Systems is responsible for the electrical engineering control systems for the locks and bridges. Heuvelman Ibis is responsible for the earthworks and the heavy sheet pile walls, and Van Heteren Weg- en Waterbouw is constructing the navigation channel. Machinefabriek Rusthoven is responsible for the moveable steel bridges, wood lock gates, operating mechanisms and associated components.
The smooth cooperation during the tender phase, design phase and construction phase, mutually, and with the client, are providing for an effective and pleasant working environment. This project is a unique example that demonstrates that cooperation can be successful by achieving project goals at an equivalent level. Under the motto that two simply know more than just one and by strategically working together, we were able to offer our client more expertise than only our own knowledge and expertise alone. We have joined forces with our partners and as such were able to provide a sustainable, low-maintenance and future-proof system with an optimal total cost of ownership (TCO).
720x1080
A beautiful project with all facets of civil engineering

Edwin Eikelboom

Ranging from construction inside the dike to results beyond the dike The new dike, locks, bridges and navigation channel will all be constructed inside the dike, on dry land. When everything is ready, the old dike will be broken open allowing the water to enter. The result: a residential district in the style of an old Zuider Zee town around the navigation lock with homes along the shoreline. In the near future, residents will simply be able to sail onto the Wolderwijd lake.

Curious what else Strukon Civiel creates?

As one Strukton Civiel, we have the professional and innovative strength to serve our customers – both nationally and regionally. And are we building an infrastructure on which the Netherlands travels smoothly.

Cookie policy

Strukton uses functional cookies to improve your site experience. By continueing to use this site you will accept this. Read more.